Department Name Project Name
NESCO UTILITY, BALASORE Execution of Turnkey contract (Supply & Erection) for strengthening of Electrical infrastructure inside Elephant Corridor in Mayurbhanj District (Package-III & IV).
NESCO UTILITY, BALASORE Execution of additional work for strengthening of Electrical infrastructure inside Suliapada-deuli-Moroda Elephant Corridor in Mayurbhanj District.
NESCO UTILITY, BALASORE Execution of turnkey contract (Supply & Erection) for strengthening of Electrical infrastructure inside Elephant Corridor and movement area under BpED, Baripada in Mayurbhanj District.
NESCO UTILITY, BALASORE Supply & Erection for Shifting of Electrical Network for Widening of NH-215 from Remuli to Guali (185 Km to 206 Km) under Package-II.
NESCO UTILITY, BALASORE Construction of new 33 KV Bay at 33/11 KV Sub-station at Sukruli in Mayurbhanj District for power supply to Mega Lift Irrigation project under deposit scheme on turnkey basis.
SOUTHCO UTILITY Execution of works under Chirikipada Package on Turnkey basis under BGJY programme.
SOUTHCO UTILITY Strengthening of distribution system for avoiding electrocution of elephants inside elephant corridor area of Ghumusur North Division of BNED, Bhanjanagar (Package-VII).
IDCO, BHUBANESWAR Construction of 11/0.4KV, 500KVA Plinth Mounted substation, 11KV OH line along with Single Pole Cut-Point, 11KV DP cut-point and 4-pole structure for Power Supply to Aluminium Park at Angul.
IDCO, BHUBANESWAR Construction of 11 KV line using 80sqmm AAAC with provision of double disc insulator and supply & installation of 500KVA, 11/0.4KV Plingth mounted substation for Power supply to Laboratory building at CET Campus, Ghatikia, Bhubaneswar.
IDCO, BHUBANESWAR • Electrical Infrastructure for Power Supply and Street Lighting inside the proposed Industrial Estate at Jaymangal consisting of 11 KV OH line (Double Circuit line-2.5km, Single Circuit line- 3.0km, 11KV four pole structure-2nos, HT Cabling, etc), 11/0.4 KV Sub-Stations (500KVA-3nos., 250KVA-1no.& 100KVA-1no.) for utilities, LT OH Line with AB Cable (0.5km) and Street Lighting System (120w LED Street lights on 10m long GI Octagonal pole-152 nos & 20m long High Mast lights-4nos.)
IDCO, BHUBANESWAR • Electrical Infrastructure for Power Supply and Street Lighting inside the proposed Industrial Estate at Kapileswar, Khordha consisting of 11 KV OH line Single Circuit line- 3.0km, 11KV four pole structure-2nos, HT Cabling, etc), 11/0.4 KV Sub-Stations (250KVA-1no) for utilities, LT OH Line with AB Cable (0.5km) and Street Lighting System (120w LED Street lights on 10m long GI Octagonal pole-40 nos & 20m long High Mast lights-1no.)
CESU, BHUBANESWAR Shifting/Conversion of lines and Sub-station from both sides of NH-53 in order to allow the road widening work in Pallahara under Rengali section in Talcher Electrical Division, Chainpal.
CESU, BHUBANESWAR Execution of 100% deposit work " Installation of 5 MVA, 33/11 KV power transformer with VCB & other accessories at 33/11 KV substation, Bharatpur to effect power supply to 1114 KW load to 9 blocks S+4 storied over plot no 1604 & 1024 KW load to the 8 blocks S+4 storied over plot no 1531, group housing project of BDA, BBSR in partly turnkey basis".
CESU, BHUBANESWAR Execution of strengthening LT electrical infrastructure in Elephant movement area under under Bamur Electrical section (Package-A) AED, Angul.
CESU, BHUBANESWAR Execution of strengthening LT Electrical infrastructure in Elephant movement area under Boinda Electrical Section (Package-E) AED, Angul.
CESU, BHUBANESWAR • Execution of strengthening LT Electrical infrastructure in Elephant movement area under Khajuriakata Electrical Section (Package-N) DED, Dhenkanal.
CESU, BHUBANESWAR Execution of strengthening LT Electrical infrastructure in Elephant movement area under Meramundali Electrical Section (Package-L) TED, Chainpal.
CESU, BHUBANESWAR Supply of materials for emergency Restoration of power supply under PED, Puri devasted during Cyclonic storm “FANI”.
ODISHA LIFT IRRIGATION CORPORATION Installation & Energisation of L.I. projects including Power Supply work and Electrification, installation of S/S and Construction of 11KV line with LT Badakera-I, Badakera-II, Gadakalupada, Sirei, Korada, Orada, Kalighadi, Pahilundi, Sanapada-III, Basantapur-III, Ollahan, Dayabihar, Gadasahi-II, Golara-II, Nalibasanta-III & IV, Dochhian,Harirajpur-I, Rengali-III, Kothabada, Aswasthapari-II, Bahilipada, Kakudia-I,II & III, Gadatorihan-IV.
ODISHA LIFT IRRIGATION CORPORATION Installation, Electrification, Energisation & Civil works for Commissioning of 100 nos of cluster Deep Bore wells in Cuttack District.
ODISHA LIFT IRRIGATION CORPORATION Installation, Electrification, Energisation & Civil works for Commissioning of 100 nos of cluster Deep Bore wells in Nayagarh District.
ODISHA WATER SUPPLY & SEWERAGE BOARD Installation of 1 MVA, 11/0.4KV Sub-station for providing 725 KW (GPS) load at 11KV metering with HT single point to the Composite office Building (B+G+4) of OWSSB & PHEO at Satyanagar, Bhubaneswar over Plot no.856(p).
Larsen & Tourbo under National Highway Authority of India. Shifting of lines and sub-stations due to widening of NH-6.(Bahargora to Singhara, Mayurbhanj, Odisha)
NESCO CAPEX Up-gradation existing 11KV line & 33KV feeder under BED Balasore, BtED Basta, CED Balasore, KED Keonjhar, JED Joda & AED Anandpur.
NESCO UTILITY AMC of 33/11KV S/S under BPED, Baipada, RED, Rairangpur & UED, Udala of Electrical circle Baripada.
NESCO UTILITY Labour charges for Restoration of Lines damaged due to Severe Cyclonic Storm "AMPHAN" under Samakhunta, Morada, Bhogarai & Dehurda Electrical Section.
NESCO UTILITY Construction of new 33KV link line from 132/33KV Tikiria Grid to 33/11KV Structure, Musakhori.
RURAL WORKS DIVISION, KARANJIA Infrastructure Strenthening work of Badajambila PHC (rest shed building/Extension of PHC Building/Compound wall/Construction of approach road and drainage) under Bisoi block under OMBADC for the year 2019-20.
R&B Shifting of 11KV/33KV/LT line work from Forest Office Chhak to Police station Chhak on Tomaka Mangalapur (Part-F) in the District of Jajpur.
NESCO UTILITY Shifting of 11KV/33KV/LT line work from Tisco Bazar to Balasore Alloys on Tomaka Mangalpur (Part-G) in the District of Jajpur.